Case: Installation of a horizontal screen 3.6 by 6.1 meters

Case: Installation of a Prime screen
Installation of a horizontal screen 3.6 by 6.1 meters
Previously, the pre-classification section of the mill and clay inclusion removal area featured non-performing roller screens that compromised all downstream processes. To add to the problem, frequent and expensive change of consumables was very costly for the company. Installation of the Prime screen and crushing characteristics adjustment increased mill's productivity from 360 t/hour to 650 t/hour, and apatite extraction by 6%!
Do not hesitate to contact us for the equipment setup and configuration.