Для повышения удобства работы с сайтом мы используем файлы cookie. В cookie содержатся данные о прошлых посещениях сайта. Если вы не хотите, чтобы эти данные обрабатывались, отключите cookie в настройках браузера.
OK
Case: Installation of a horizontal screen 3.6 by 6.1 meters
Case: Installation of a Prime screen
Installation of a horizontal screen 3.6 by 6.1 meters Previously, the pre-classification section of the mill and clay inclusion removal area featured non-performing roller screens that compromised all downstream processes. To add to the problem, frequent and expensive change of consumables was very costly for the company. Installation of the Prime screen and crushing characteristics adjustment increased mill's productivity from 360 t/hour to 650 t/hour, and apatite extraction by 6%!
Do not hesitate to contact us for the equipment setup and configuration.
You can contact us by filling in the feedback form or give us a call 8 (800) 301 27 73; +7 (4722) 23-28-39